05Industry

Construction Equipment

Retrofit heavy earth-moving equipment without pulling machines off the job site. HY-Ranger installs alongside existing engines and reports back to a single fleet view.

Talk to an Expert
100%
PM reduction
< 2 hrs
Install time
12-23%
Fuel savings
01Overview

How HY-Ranger fits construction equipment.

Construction operators live and die by uptime — a machine off the job is revenue lost. The HY-Ranger installs in a standard 2-hour maintenance window with no engine teardown, no rebuild, and no change to how the operator runs the machine. Rainbow Concrete Industries deployed it on a 2016 Mack 13L concrete truck and passed SAE snap-acceleration inspection with 100% PM reduction — same truck, same route, cleaner exhaust.

02Equipment Coverage
  • Excavators
  • Wheel loaders
  • Bulldozers
  • Motor graders
  • Concrete mixers
  • Rock trucks
03Operator Pain Points

What we hear on-site.

  • Diesel volatility eating margin on fixed-price contracts
  • Tightening opacity and PM inspections on older iron
  • Equipment downtime for major emissions retrofits kills schedules
  • ESG and low-carbon procurement scoring on public projects
04How Debwewin-HYGN Shows Up

Relevant retrofit solutions.

  • HY-Ranger HEADS retrofit — 2-hour install, no engine modifications
  • Distilled-water-only consumable — no hydrogen storage on-machine
  • Third-party verified PM, CO, and NOx reductions for tender submissions
  • Non-critical to engine — machine continues to run if unit is serviced
05Predictable Engagement

Four steps. No surprises.

01

Assess

On-site discovery and fuel/emissions baseline.

02

Install

2-hour HY-Ranger install in your maintenance window.

03

Verify

Third-party emissions and fuel-consumption testing.

04

Operate

Distilled-water consumable, ongoing support.